Diseño del sistema de aire acondicionado para el hospital de contingencia San Martín de Porres de Iberia, distrito de Iberia, provincia de Tahuamanu Madre de Dios
dc.contributor.advisor | Yupanqui Rodríguez, Carlos | es_PE |
dc.contributor.author | Flores Silva, Jhoksan Anthony | es_PE |
dc.date.accessioned | 2025-02-12T03:50:28Z | |
dc.date.available | 2025-02-12T03:50:28Z | |
dc.date.issued | 2025-01-03 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12893/14063 | |
dc.description.abstract | El Hospital de Contingencia San Martín de Porres de Iberia, no cuenta con un confort térmico en sus instalaciones, por lo tanto, el objetivo de esta investigación fue diseñar un sistema de aire acondicionado que cumplan con las normativas de salud necesarias. El tipo de investigación fue descriptivo y diseño no experimental. La muestra estuvo conformada por los ambientes del Hospital de Contingencia San Martín de Porres de Iberia. El instrumento utilizado fue el cuestionario. Los resultados mostraron que, los flujos de aire necesarios por ambientes son 701 CFM para sala de partos, sala de rayos X 1,331 CFM, laboratorios 1,639 CFM, sala de hospitalización y esclusa 352 CFM y almacén para material estéril 174 CFM. También, se estableció que los ductos se instalaran en un falso cielo raso de 1.10m para el 1er piso y 0.75m para el 2do piso, mientras que, en las dimensiones se determinó que para ductos de 12” se utilizará plancha de 1/54” de espesor; en ductos de 13-30” plancha de 1/40” de espesor; en ductos entre 31-45” plancha de 1/27” de espesor, con correderas de 1” a máximo 2.40 m y en ductos entre 46”-84” plancha de 1/20” de espesor, con correderas de 1½” a máximo 1.20 m junto con refuerzos de ángulos de 1”x1/8”. Por otra parte, en las dimensiones de los difusores se obtuvo 12 x 12” y 20 x 12” para rejillas. Además, los equipos seleccionados fueron unidades manejadoras de aire y splits decorativo. Por último, el diseño, obtuvo un VAN de $107,467.49, TIR de 24% y B/C de 1.09, lo que significó que si es viable económicamente. Se concluyó que, el diseño del sistema de aire acondicionado logra integrar todos los ambientes de ambos pisos del hospital en las condiciones respectivas y cumple con las normas NTS Nº113, ASHRAE y RNE. | es_PE |
dc.description.abstract | The San Martín de Porres Contingency Hospital of Iberia does not have a thermal comfort in its facilities, therefore, the objective of this research was to design an air conditioning system that complies with the necessary avalanche regulations. The type of research was descriptive and non-experimental design. The sample was made up of the environments of the San Martín de Porres Contingency Hospital in Iberia. The instrument used was the questionnaire. The results showed that, the air flows required by environments are 1,332 CFM for delivery room, X-ray room 1,029 CFM, communications rooms 609 CFM, heated area 690 CFM, laboratories 1,556 CFM, hospitalization room and lock 352 CFM and warehouse for sterile material 177 CFM. Also, it was established that the ducts were installed in a false ceiling of 1.10m for the 1st floor and 0.75m for the 2nd floor, while, in the dimensions it was determined that for 12" ducts 1/54" thick plate will be used; in ducts of 13-30" plate of 1/40" thickness; in ducts between 31-45" plate of 1/27" thickness, with sliding 1" to maximum 2.40 m and in ducts between 46"-84" plate of 1/20" thickness, with slides of 11/2" to maximum 1.20 m along with reinforcements of angles of 1"x1/8". On the other hand, in the dimensions of the diffusers, 12 x 12" and 20 x 12" for grids were obtained. In addition, the selected equipment were air handling and split decorative units. Finally, the design obtained a NPV of $107,467.49, IRR of 24% and B/C of 1.09, which meant that it is economically viable. It was concluded that, the design of the air conditioning system manages to integrate all the environments of both floors of the hospital in the respective conditions and complies with NTS N°. 113, ASHRAE and RNE standards. | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
dc.subject | Equipamiento médico | es_PE |
dc.subject | Ingeniería | es_PE |
dc.subject | Tecnología | es_PE |
dc.subject | Medical equipment | es_PE |
dc.subject | Engineering | es_PE |
dc.subject | Technology | es_PE |
dc.title | Diseño del sistema de aire acondicionado para el hospital de contingencia San Martín de Porres de Iberia, distrito de Iberia, provincia de Tahuamanu Madre de Dios | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.name | Ingeniero Mecánico Electricista | es_PE |
thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Mecánica y Eléctrica | es_PE |
thesis.degree.discipline | Ingeniería Mecánica y Eléctrica | es_PE |
dc.type.version | info:eu-repo/semantics/draft | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.02.01 | es_PE |
renati.author.dni | 72305785 | |
renati.advisor.dni | 18006325 | |
renati.advisor.orcid | https://orcid.org/0000-0003-2434-3633 | es_PE |
renati.type | http://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
renati.discipline | 713076 | es_PE |
renati.juror | Celada Padilla, James Skinner | es_PE |
renati.juror | Oliden Núñez, Héctor Antonio | es_PE |
renati.juror | Puyen Mateo, Néstor Daniel | es_PE |