Mostrar el registro sencillo del ítem
Aplicación BIM en la II.EE N°429 distrito La Victoria-Chiclayo- Lambayeque para optimización de costos y detección de incompatibilidades e interferencias
dc.contributor.advisor | Blas Rebaza, Rocio del Pilar | es_PE |
dc.contributor.author | Porras Lopez, Wilber Jhonjairo | es_PE |
dc.contributor.author | Salazar Esqueche, Joseph Manuel | es_PE |
dc.date.accessioned | 2025-06-27T17:36:07Z | |
dc.date.available | 2025-06-27T17:36:07Z | |
dc.date.issued | 2025-06-11 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12893/14842 | |
dc.description.abstract | La presente investigación tiene su origen en las inconsistencias que surgen al elaborar un expediente técnico. Según INFOBRAS a enero del 2025 existen 1418 obras paralizadas en el Perú, esto debido a diversas causas, una de ellas son las “Deficiencias en el Expediente Técnico”, actualmente la elaboración de un expediente técnico es un proceso típico y antiguo, esta hace uso de herramientas básicas logrando así tener una metodología desfasada ante una época donde la tecnología está a la vanguardia. El propósito de esta tesis es aplicar la metodología BIM en el proyecto de infraestructura “II.EE N°429 Distrito la Victoria – Chiclayo – Lambayeque” con el fin de comprobar la optimización de costos y detección de incompatibilidades e interferencias. En tal sentido, primero se obtuvo acceso a un expediente técnico elaborado con la metodología tradicional, se accedió a los planos y se aplicó herramientas BIM tales como Revit y Navisworks con la finalidad de mejorar la calidad del entregable, evaluando así todos los beneficios que nos ofrecen esta metodología. Según los resultados, al aplicar BIM se obtiene un costo directo de S/1,600,260.95 y según la metodología tradicional un costo directo de S/1,610,546.80 obteniendo un ahorro de S/10,285.85, así también se detectaron 68 interferencias entre las distintas especialidades del proyecto haciendo uso del software Navisworks. En definitiva, se ha comprobado que al aplicar la metodología BIM se optimiza el costo directo en S/10,285.85, así mismo al detectar las 68 interferencias en la fase de elaboración de expediente técnico se logra prevenir errores antes de la ejecución de obra, con el fin de evitar retrasos de obra, adicionales, modificaciones presupuestales, paralización de obra, entre otros. | es_PE |
dc.description.abstract | The present investigation has its origin in the inconsistencies that arise when preparing a technical file. According to INFOBRAS to January 2025 there are 1414 paralyzed works in Peru, this due to various causes, one of them are the “Deficiencies in the technical file”, currently the elaboration of a technical file is a typical and old process, this makes use of basic tools thus achieving an outdated methodology in an era where technology is at the forefront. The purpose of this thesis is to apply the BIM methodology in the infrastructure project “II.EE N°429 Distrito la Victoria - Chiclayo - Lambayeque” in order to check the cost optimization and detection of incompatibilities and interferences. In this sense, first we obtained access to a technical file prepared with the traditional methodology, we accessed the plans and applied BIM tools such as Revit and Navisworks in order to improve the quality of the deliverable, thus evaluating all the benefits offered by this methodology. According to the results, by applying BIM we obtained a direct cost of S/1,600,260.95 and according to the traditional methodology a direct cost of S/1,610,546.80 obtaining a saving of S/10,285.85, also 68 interferences between the different specialties of the project were detected by using the Navisworks software. Therefore, it has been proven that the application of the BIM methodology optimizes the direct cost by S/10,285.85. Likewise, by detecting the 68 interferences in the technical file preparation phase, errors can be prevented before the execution of the work, in order to avoid work delays, additional costs, budget modifications, stoppage of work, among others. | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
dc.subject | Especificaciones técnicas | es_PE |
dc.subject | Metodología BIM | es_PE |
dc.subject | Expediente técnico | es_PE |
dc.title | Aplicación BIM en la II.EE N°429 distrito La Victoria-Chiclayo- Lambayeque para optimización de costos y detección de incompatibilidades e interferencias | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.type.version | info:eu-repo/semantics/acceptedVersion | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
renati.author.dni | 72487337 | |
renati.author.dni | 70451282 | |
renati.advisor.dni | 18080838 | |
renati.advisor.orcid | https://orcid.org/0000-0002-9376-3095 | es_PE |
renati.type | http://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Mondragón Castañeda, Carlos Ernesto | es_PE |
renati.juror | Dávila Vidarte, Domingo Jorge Luis | es_PE |
renati.juror | Capuñay Capuñay, Yrma del Carmen | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [296]