Mostrar el registro sencillo del ítem
Implementación de la metodología BIM en el proyecto de infraestructura pública: Mejoramiento de los servicios de salud del EE. SS I-1 Maraypampa, EE. SS I-1 el Quio, EE. SS I-1 Mitopampa, EE. SS I-1 Mayobamba y EE. SS I-1 Romero circa, en los distritos de Santa cruz y Saucepampa de la provincia de Santa cruz departamento de Cajamarca.
| dc.contributor.advisor | Serrano Zelada, Ovidio | es_PE |
| dc.contributor.author | Cusma Sánchez, Jhosep Donovan | es_PE |
| dc.contributor.author | Garay Flores, Antonio Yoshy | es_PE |
| dc.date.accessioned | 2025-12-15T15:56:15Z | |
| dc.date.available | 2025-12-15T15:56:15Z | |
| dc.date.issued | 2025-12-11 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/15791 | |
| dc.description.abstract | El Building Information Modeling (BIM), conocido en español como Modelado de la Información en la Construcción, es una metodología colaborativa que integra procesos, estándares y herramientas tecnológicas para la gestión integral de la información de un proyecto. No obstante, su adopción en el sector público aún es limitada, debido al desconocimiento de su verdadero potencial por parte de muchos de los actores involucrados. El objetivo de esta investigación fue analizar el impacto de la implementación de la metodología BIM en el proyecto de infraestructura pública “Mejoramiento de los servicios de salud del EE. SS I-1 Maraypampa, EE. SS I-1 El Quio, EE. SS I-1 Mitopampa, EE. SS I-1 Mayobamba y EE. SS I-1 Romero Circa, ubicados en los distritos de Santa Cruz y Saucepampa, provincia de Santa Cruz – departamento de Cajamarca”. La investigación se llevó a cabo con un enfoque cuantitativo, de carácter aplicado, con un nivel descriptivo y un diseño no experimental de corte transversal, sustentado en el método científico. Los hallazgos muestran que la adopción de la metodología BIM produce un efecto favorable en el ámbito económico, especialmente en la medición de metrados, al lograr un 17.17 % de mayor exactitud en comparación con el método manual. Asimismo, la comparación de los presupuestos analizados en el desarrollo del estudio refleja, en ambos escenarios, un incremento del monto total del proyecto respecto al presupuesto inicial. Esta precisión repercute de manera directa en los costos constructivos, dado que contar con metrados confiables facilita la planificación de compras de materiales, disminuye pérdidas y evita la generación de excedentes en obra. | es_PE |
| dc.description.abstract | Building Information Modeling (BIM) is a collaborative methodology that integrates processes, standards, and technological tools for the comprehensive management of project information. However, its adoption in the public sector remains limited, as many stakeholders are still unaware of its full potential. The objective of this research was to analyze the impact of BIM implementation in the public infrastructure project “Improvement of Health Services at EE. SS I-1 Maraypampa, EE. SS I-1 El Quio, EE. SS I-1 Mitopampa, EE. SS I-1 Mayobamba, and EE. SS I-1 Romero Circa, located in the districts of Santa Cruz and Saucepampa, province of Santa Cruz – department of Cajamarca.” The research was conducted using a quantitative approach, applied in nature, with a descriptive level and a non-experimental, cross-sectional design, grounded in the scientific method. The findings indicate that the adoption of the BIM methodology has a positive impact on the economic dimension, particularly in the measurement of quantities, achieving 17.17% greater accuracy compared to the manual method. Likewise, the comparison of the budgets analyzed in the course of the study shows, in both scenarios, an increase in the total project cost relative to the original budget. This higher level of precision directly affects construction costs, as having reliable quantity takeoffs facilitates material procurement planning, reduces waste, and prevents the accumulation of surpluses on site. | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Tecnologías de construcción | es_PE |
| dc.subject | Estructuras de salud | es_PE |
| dc.subject | Costos constructivos | es_PE |
| dc.subject | Building Information modelin | es_PE |
| dc.title | Implementación de la metodología BIM en el proyecto de infraestructura pública: Mejoramiento de los servicios de salud del EE. SS I-1 Maraypampa, EE. SS I-1 el Quio, EE. SS I-1 Mitopampa, EE. SS I-1 Mayobamba y EE. SS I-1 Romero circa, en los distritos de Santa cruz y Saucepampa de la provincia de Santa cruz departamento de Cajamarca. | es_PE |
| dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 72912734 | |
| renati.author.dni | 46690192 | |
| renati.advisor.dni | 16716243 | |
| renati.advisor.orcid | https://orcid.org/0000-0002-9558-2853 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#tesis | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 732016 | es_PE |
| renati.juror | Cueva Campos, Hamilton Vladimir | es_PE |
| renati.juror | Huangal Castañeda, Nelson Enrique | es_PE |
| renati.juror | Bernilla Gonzales, Jannyna Beatriz | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [336]







