dc.description.abstractEl Alimentador C-216 Chiclayo, que cuenta con una capacidad de generación eléctrica de 10 megavatios, se encarga de proveer energía a un total de 32 subestaciones que pertenecen a Electronorte S.A. Este alimentador ha logrado exceder, durante el año 2024, los estándares y valores establecidos por la Organización para la Supervisión de la Inversión en Energía y Minería (OSIGNERMIN), tal como se detalla en la Tabla número 03. Después de realizar un análisis exhaustivo, llegamos a la conclusión de que el Alimentador C-216 Chiclayo presenta una fiabilidad bastante baja a causa de problemas de sobrecarga. Por lo tanto, es imperativo que se implementen medidas urgentes para abordar esta situación y mejorar la confiabilidad del sistema. Con el objetivo de aumentar la fiabilidad y la estabilidad del Alimentador C-216, se llevará a cabo la instalación de un sistema de Generación Distribuida basado en energía solar, con una capacidad total de 0,5 MW. Esta decisión se toma en respuesta a las preocupaciones surgidas por la deficiente calidad de suministro eléctrico actualmente experimentada. La planta de energía solar, conocida como La Central Solar, estará compuesta por un total de 1368 paneles solares, cada uno con una capacidad de 360 vatios pico (Wp). Además, se instalará un inversor con una capacidad máxima de 500 kilovatios (kW) cada uno, así como un transformador que tiene una potencia de 600 kilovoltios-amperios (kVA). Este transformador desempeñará la importante función de convertir la tensión generada por los paneles solares a un nivel de 10 kilovoltios (kV). La implementación del Sistema de Generación Distribuida en el Alimentador C-216 contribuye significativamente a la optimización de la calidad de la energía proporcionada, logrando que los índices de continuidad del servicio, como SAIDI, SAIFI, CAIDI y ASAI, se mantengan por debajo de los niveles máximos que han sido determinados y establecidos por la entidad reguladora OSINERGMIN. La cantidad total de dinero que se necesita para llevar a cabo el Sistema de Generación Distribuida asciende a S/.2 097 779,57, con un costo de generación de 0,296 S/./kWh, con una TIR de 18,08% y un VAN de S/. 4 815 472,523. Todos estos indicadores financieros ponen de manifiesto que este proyecto es económicamente viable y favorable.es_PE
dc.description.abstractThe C-216 Chiclayo Feeder, which has an electrical generation capacity of 10 megawatts, is responsible for supplying power to a total of 32 substations belonging to Electronorte S.A. This feeder has managed to exceed, during the year 2024, the standards and values established by the Organization for the Supervision of Investment in Energy and Mining (OSIGNERMIN), as detailed in Table 3. After conducting an exhaustive analysis, we concluded that the C-216 Chiclayo Feeder presents quite low reliability due to overload problems. Therefore, it is imperative that urgent measures be implemented to address this situation and improve the reliability of the system. In order to increase the reliability and stability of the C-216 Feeder, a distributed generation system based on solar energy will be installed, with a total capacity of 0.5 MW. This decision is made in response to concerns about the currently poor quality of the electricity supply. The solar power plant, known as La Central Solar, will be composed of a total of 1,368 solar panels, each with a capacity of 360 watts peak (Wp). Additionally, an inverter with a maximum capacity of 500 kilowatts (kW) will be installed, as well as a transformer with a power rating of 600 kilovolt-amperes (kVA). This transformer will perform the important function of converting the voltage generated by the solar panels to a level of 10 kilovolts (kV). The implementation of the Distributed Generation System on Feeder C-216 significantly contributes to optimizing the quality of the energy provided, ensuring that service continuity indices, such as SAIDI, SAIFI, CAIDI, and ASAI, remain below the maximum levels determined and established by the regulatory entity OSINERGMIN. The total amount of money needed to implement the Distributed Generation System amounts to S/. 2 097 779,57, with a generation cost of S/. 0.296/kWh, an IRR of 18,08%, and an NPV of S/. 4 815 472,523. All these financial indicators demonstrate that this project is economically viable and favorable.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Nacional Pedro Ruiz Galloes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/es_PE
dc.subjectCalidad de la Energíaes_PE
dc.subjectAlimentador en Media Tensiónes_PE
dc.subjectDistributed generationes_PE
dc.subjectGeneración distribuidaes_PE
dc.subjectPower Qualityes_PE
dc.subjectMedium Voltage Feederes_PE
dc.titleAnálisis de la generación distribuida para mejorar la calidad de energía eléctrica en el alimentador C-216 de la empresa Electronorte SA – Lambayequees_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Mecánico Electricistaes_PE
thesis.degree.grantorUniversidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Mecánica y Eléctricaes_PE
thesis.degree.disciplineIngeniería Mecánica y Eléctricaes_PE
dc.type.versioninfo:eu-repo/semantics/submittedVersiones_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.02.01es_PE
renati.author.dni72051048
renati.advisor.dni16699530
renati.advisor.orcidhttps://orcid.org/0000-0003-3643-5498es_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales_PE
renati.discipline713076es_PE
renati.jurorCelada Padilla, James Skinneres_PE
renati.jurorGutierrez Atoche, Egberto Serafines_PE
renati.jurorOliden Nuñez, Hector Antonioes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess
Universidad Nacional Pedro Ruiz Gallo

Calle Juan XXIII 391 Lambayeque - Perú | Telf. 283146 - 283115 - 282120 - 282356

Todos los contenidos de repositorio.unprg.edu.pe están bajo la Licencia Creative Commons v.4.0

repositorio@unprg.edu.pe