Mostrar el registro sencillo del ítem
Análisis del factor Productividad de mano de obra en obras de Saneamiento Básico Rural ejecutadas por la modalidad de Núcleos ejecutores en la Región Huánuco
| dc.contributor.advisor | Salazar Bravo, Wesley Amado | es_PE |
| dc.contributor.author | Valle Rubio, Danferd Andree | es_PE |
| dc.contributor.author | Rodriguez Santa Cruz, Jorge Luis | es_PE |
| dc.date.accessioned | 2026-01-20T17:44:12Z | |
| dc.date.available | 2026-01-20T17:44:12Z | |
| dc.date.issued | 2025-11-13 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/15946 | |
| dc.description.abstract | La presente investigación tiene como objetivo evaluar el nivel de productividad de la mano de obra en obras de saneamiento básico rural, ejecutadas por núcleos ejecutores en la región Huánuco. Para ello, se describieron las actividades correspondientes a cada partida mediante diagramas de flujo, con el fin de comprender el desarrollo general de los trabajos. Posteriormente, se realizó el levantamiento de datos en campo a través de la observación directa y el registro de las actividades ejecutadas por los obreros durante una hora específica para cada partida evaluada. Las actividades observadas fueron clasificadas en tiempos productivos, tiempos contributorios y tiempos no contributorios, de acuerdo con su naturaleza y contribución al avance de la obra. Se evaluaron tres partidas: cama de apoyo, instalación de tubería y relleno y compactación, en cinco proyectos distintos. Los resultados revelaron que, en todos los casos, el nivel de productividad de la mano de obra se ubicó entre los niveles “muy bajo” y “bajo”. Entre los principales factores que afectaron negativamente esta productividad se identifican la falta o deficiencia de capacitaciones, la mano de obra no calificada, el desorden en el espacio de trabajo y la distancia del acarreo, lo cual generó una mayor proporción de tiempo no contributorio asociado a esperas, descansos y conversaciones, evidenciando una falta de coordinación y organización en la ejecución de los trabajos en campo. | es_PE |
| dc.description.abstract | This research aims to evaluate the labor productivity level in rural basic sanitation projects executed through the núcleo ejecutor modality in the Huánuco region. For this purpose, the activities corresponding to each work item were described using flowcharts to understand the general development of the tasks. Subsequently, data collection was carried out in the field through direct observation and the recording of activities performed by workers during a specific one-hour period for each evaluated item. The observed activities were classified into productive, contributory, and non-contributory time, according to their nature and contribution to the progress of the work. Three work items were evaluated: bedding layer, pipe installation, and backfilling and compaction, across five different projects. The results revealed that, in all cases, labor productivity ranged between "very low" and "low" levels. The main factors negatively affecting productivity were identified as the lack or deficiency of training, unskilled labor, disorganized workspaces, and hauling distances. These factors resulted in a higher proportion of non-contributory time related to waiting, resting, and talking, highlighting a lack of coordination and organization during fieldwork execution. | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Cartas de balance | es_PE |
| dc.subject | Saneamiento básico rural | es_PE |
| dc.subject | Diagrama de flujo | es_PE |
| dc.subject | Rural basic sanitation works | es_PE |
| dc.title | Análisis del factor Productividad de mano de obra en obras de Saneamiento Básico Rural ejecutadas por la modalidad de Núcleos ejecutores en la Región Huánuco | es_PE |
| dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 73882805 | |
| renati.author.dni | 70211306 | |
| renati.advisor.dni | 16543938 | |
| renati.advisor.orcid | https://orcid.org/0000-0002-0239-4627 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#tesis | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 732016 | es_PE |
| renati.juror | Cueva Campos, Hamilton Vladimir | es_PE |
| renati.juror | Davila Vidarte, Domingo Jorge Luis | es_PE |
| renati.juror | Huangal Castañeda, Nelson Enrique | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [346]