La Institución Educativa N.° 11088 “Enrique López Albújar”, en el C.P. Pasabar Oleoducto
(Olmos, Lambayeque), presenta conectividad limitada por ausencia de última milla, cobertura
móvil irregular y restricciones operativas del entorno rural. Se diseñó una infraestructura de
telecomunicaciones para garantizar acceso estable a Internet en la institución. Se aplicó un enfoque
cuantitativo con diseño descriptivo no experimental: se revisó literatura sobre conectividad rural,
se modelaron tres alternativas (PTP 5.8 GHz, GPON y satelital GEO) y se evaluaron mediante
simulación y criterios técnico-económicos. En el PTP se estimó potencia recibida de −59 dBm (±5
dB), throughput IP medio de 48.26 Mbps frente a 40 Mbps requeridos (121%) y disponibilidad de
99.9996%; además, se obtuvo 96.52 Mbps agregados, margen de ganancia de 32.40 dB y pérdida
total de 132.81 dB, evidenciando holgura operativa. En la comparación, GPON se proyectó con
≥1 Gbps y latencia 1–5 ms, mientras el satélite GEO aportó continuidad con latencia aproximada
de 240 ms. Se concluyó que una arquitectura híbrida, con GPON como medio principal, satélite
como respaldo y PTP como enlace auxiliar, optimiza desempeño, resiliencia y sostenibilidad
institucional. Institución Educativa No. 11088 “Enrique López Albújar”, located in Pasabar Oleoducto (Olmos,
Lambayeque), faces constrained Internet access due to lack of last-mile infrastructure, irregular
mobile coverage, and rural operational conditions. A telecommunications infrastructure was
designed to provide stable Internet service for the school. A quantitative, descriptive, non-
experimental approach was applied: rural connectivity literature was examined, three alternatives
(5.8 GHz PTP, GPON, and geostationary satellite) were modeled, and performance was assessed
through simulation and techno-economic criteria. For the PTP option, predicted receive power was
−59 dBm (±5 dB), mean IP throughput reached 48.26 Mbps versus a 40 Mbps requirement (121%),
and availability was estimated at 99.9996%; aggregate throughput was 96.52 Mbps, with a 32.40
dB system gain margin and 132.81 dB total path loss, indicating robust operational headroom. In
the comparative analysis, GPON was projected to deliver ≥1 Gbps with 1–5 ms latency, while
GEO satellite ensured service continuity with approximately 240 ms latency. The main conclusion
supports a hybrid architecture—GPON as primary access, satellite as backup, and PTP as an
auxiliary/local link—to balance performance, resilience, and long-term operability in the school
context.