Mostrar el registro sencillo del ítem

dc.contributor.advisorCueva Campos, Hamilton Vladimires_PE
dc.contributor.authorSánchez Tesén, Mario Antonioes_PE
dc.date.accessioned2026-05-12T17:41:51Z
dc.date.available2026-05-12T17:41:51Z
dc.date.issued2026-04-28
dc.identifier.urihttps://hdl.handle.net/20.500.12893/16978
dc.description.abstractLa presente investigación tuvo como objetivo realizar un análisis integral Técnico, Legal y Social sobre el incumplimiento en la ejecución del proyecto de saneamiento en las localidades de Canchán, Catahuasi y Huayampi, en la provincia de Yauyos, Lima. El problema principal se originó en una deficiente elaboración del expediente técnico, el cual proyectó inicialmente 8 cruces de vía nacional y regional sin contar con la autorización de uso del derecho de vía emitida por la autoridad competente (Provías). Esta omisión normativa y técnica derivó en la paralización de la obra, vulnerando el derecho humano al acceso a servicios básicos de la población local. El estudio empleó una metodología mixta, integrando el análisis documental de asientos de cuaderno de obra y planos de replanteo, con un enfoque cuantitativo mediante una encuesta de percepción ciudadana. Los resultados revelan que la principal causa de la paralización fue la deficiente gestión de servidumbres y permisos de paso, lo cual obligó a modificaciones sustanciales en la ingeniería del trazo original. Esta deficiencia técnica-legal no solo incrementó los plazos y costos, sino que detonó un descontento social en el 70% de la población, quienes asocian la inactividad con una falta de transparencia institucional. Se concluye que el incumplimiento del proyecto no fue una limitante física del terreno, sino un error de planificación y falta de gestión de riesgos preventivos en la etapa de preinversión. La propuesta de solución técnica presentada no solo destrabó la viabilidad legal del proyecto ante el Ministerio de Transportes y Comunicaciones, sino que representó una optimización en los costos de ejecución y una reducción en los plazos de entrega. Se recomienda a las unidades ejecutoras de Yauyos implementar protocolos de verificación de libre disponibilidad de terrenos e interferencias viales previo a la aprobación de expedientes técnicos para asegurar la continuidad de las inversiones en saneamiento rural.es_PE
dc.description.abstractThe objective of this investigation was to conduct a comprehensive technical, legal, and social analysis of the failure to execute the sanitation project in the towns of Canchán, Catahuasi, and Huayampi, in the province of Yauyos, Lima. The main problem stemmed from a poorly prepared technical file, which initially planned for eight national and regional road crossings without obtaining authorization for the right of way from the competent authority (Provías). This regulatory and technical omission led to the paralysis of the project, violating the human right of the local population to access basic services. The study employed a mixed methodology, integrating documentary analysis of construction log entries and layout plans with a quantitative approach using a citizen perception survey. The results reveal that the main cause of the stoppage was poor management of easements and right- of-way permits, which forced substantial modifications to the original engineering design. This technical-legal deficiency not only increased deadlines and costs, but also triggered social discontent among 70% of the population, who associate the inactivity with a lack of institutional transparency. It is concluded that the failure to complete the project was not due to physical limitations of the terrain, but rather to a planning error and a lack of preventive risk management in the pre- investment stage. The proposed technical solution not only unlocked the legal viability of the project before the Ministry of Transportation and Communications, but also optimized implementation costs and reduced delivery times. It is recommended that the Yauyos implementing units implement protocols to verify the free availability of land and road interference prior to the approval of technical files to ensure the continuity of investments in rural sanitation.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Nacional Pedro Ruiz Galloes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/es_PE
dc.subjectReingenieríaes_PE
dc.titleAnálisis técnico, legal y social del incumplimiento del proyecto de saneamiento en canchán, catahuasi y huayampi, provincia de yauyos – lima: causas, consecuencias y propuestas de solución ante la falta de uso del derecho de víaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.grantorUniversidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitecturaes_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.type.versioninfo:eu-repo/semantics/submittedVersiones_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.01es_PE
renati.author.dni16753155
renati.advisor.dni41564701
renati.advisor.orcidhttps://orcid.org/0000-0002-9763-5672es_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorGuzman Vigo, Marco Antonioes_PE
renati.jurorSalazar Bravo, Wesley Amadoes_PE
renati.jurorCachay Silva, Roberto Carloses_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess
Universidad Nacional Pedro Ruiz Gallo

Calle Juan XXIII 391 Lambayeque - Perú | Telf. 283146 - 283115 - 282120 - 282356

Todos los contenidos de repositorio.unprg.edu.pe están bajo la Licencia Creative Commons v.4.0

repositorio@unprg.edu.pe