Mostrar el registro sencillo del ítem
Ejecución de obras civiles en la construcción de defensas ribereñas en sector Sechin (tramo 1 y 2)-Casma
| dc.contributor.advisor | Capuñay Capuñay, Yrma del Carmen | es_PE |
| dc.contributor.author | Julca Peralta, Jorge Luis | es_PE |
| dc.date.accessioned | 2026-01-23T15:56:04Z | |
| dc.date.available | 2026-01-23T15:56:04Z | |
| dc.date.issued | 2025-05-12 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/16002 | |
| dc.description.abstract | Este informe detalla mi experiencia profesional en uno de los proyectos en los que he trabajado: “EJECUCIÓN DE OBRAS CIVILES EN LA CONSTRUCCIÓN DE DEFENSAS RIBEREÑAS EN SECTOR SECHIN (TRAMO 1 Y 2)-CASMA” Este proyecto es relevante pues es necesario para poder asegurar que el agua de regadío sea abastecida mediante bocatomas y retornos, así como la limpieza del cauce de los ríos (Rampas) por la ejecución de los diques proyectados a fin de mitigar la afectación de una inundación a las Unidades Productoras de bienes y servicios públicos, además de la población que se ha ubicado en ambos márgenes de los ríos Sechín, Grande y Casma, los cuales, en la Cuenca de Casma componen el sistema hidrográfico principal. La finalidad principal del presente informe es compartir la experiencia que obtuve en durante el desarrollo del proyecto: “Ejecución de obras civiles en la construcción de defensas ribereñas en sector Sechín (Tramo 1 y 2)-Casma”. Mis responsabilidades abarcaron desde la elaboración de los planos de replanteo, el seguimiento correcto de las Especificaciones Técnicas en la ejecución de las obras civiles y de la cuantificación de materiales involucrados en la valorización de las metas definidas en el expediente técnico. | es_PE |
| dc.description.abstract | This report details my professional experience on one of the projects I worked on: "EXECUTION OF CIVIL WORKS IN THE CONSTRUCTION OF RIVERBANK DEFENSES IN SECTOR SECHIN (TRAMPS 1 AND 2) - CASMA". This project is relevant because it is necessary to ensure that irrigation water is supplied through intakes and returns, as well as the cleaning of the riverbeds (Ramps) due to the execution of the projected dams in order to mitigate the impact of a flood. to the Production Units of public goods and services, in addition to the population that has been located on both banks of the Sechín, Grande and Casma rivers, which, in the Casma Basin make up the system main hydrographic. The main purpose of this report is to share the experience I obtained during the development of the project: “Execution of civil works in the construction of river defenses in the Sechín sector (Section 1 and 2)-Casma”. My responsibilities ranged from the preparation of layout plans, the correct monitoring of the Technical Specifications in the execution of civil works and the quantification of materials involved in the valuation of the goals defined in the technical file. | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Obras Civiles | es_PE |
| dc.subject | Defensas Rivereñas | es_PE |
| dc.title | Ejecución de obras civiles en la construcción de defensas ribereñas en sector Sechin (tramo 1 y 2)-Casma | es_PE |
| dc.type | info:eu-repo/semantics/monograph | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 47442278 | |
| renati.advisor.dni | 16736976 | |
| renati.advisor.orcid | https://orcid.org/0000-0003-0586-0328 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 732016 | es_PE |
| renati.juror | Cáceres Narrea, Aníbal Quintin | es_PE |
| renati.juror | Davila Vidarte, Domingo Jorge Luis | es_PE |
| renati.juror | Bernilla Gonzales, Jannina Beatriz | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [112]







