Implementación del plan de ejecución BIM para la coordinación y control en la construcción de defensas ribereñas del subproyecto A1 en la cuenca del rio Motupe y rio La Leche - paquete MO.1
| dc.contributor.advisor | Bernilla Gonzales, Jannyna Beatriz | es_PE |
| dc.contributor.author | Reyes Cumpa, Edy Yercy | es_PE |
| dc.date.accessioned | 2026-02-19T14:32:47Z | |
| dc.date.available | 2026-02-19T14:32:47Z | |
| dc.date.issued | 2025-12-22 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/16214 | |
| dc.description.abstract | La indagación cuya denominación corresponde a PAQUETE MO.1 – CONSTRUCCIÓN DEL SUBPROYECTO A1 EN LA CUENCA DEL RÍO MOTUPE, integra el programa más completo de Defensas Ribereñas para el Río La Leche y Río Motupe. Este estudio contempla como objetivo implementar soluciones para mitigar el riesgo de inundaciones en las zonas aledañas a los ríos La Leche y Motupe, contribuyendo a la mejora de la seguridad y calidad de vida de comunidades respectivas. El paquete A1, construcción de defensas ribereñas i adecuación de interferencias hidráulicas, esta enfocado a que contribuyan el correcto control de río. La participación en la cual estuve involucrado se basó en la aplicación de la metodología BIM, responsable de la elaboración de los modelos tridimensionales, la coordinación entre los mismos. Gestionar la colaboración entre las distintas áreas del proyecto como: producción, planeamiento, calidad, costos y otras, garantizando así el correcto flujo de la información de los distinto componentes del proyecto. Esta gestión contribuye a optimizarlos recursos, eficiencia en tiempo y equipos, para así lograr una eficiente ejecución de los trabajos en obra. La relevancia de BIM parte de su capacidad para contribuir en la mejora de la comunicación, coordinación y el control de calidad, como aspectos elementales para garantizar una ejecución de proyectos de infraestructura hidráulica exitosa, como es el caso del citado proyecto. | es_PE |
| dc.description.abstract | The investigation, entitled PACKAGE MO.1 – CONSTRUCTION OF SUBPROJECT A1 IN THE MOTUPE RIVER BASIN, is part of the most comprehensive Riverside Defense program for the La Leche and Motupe Rivers. This study aims to implement solutions to mitigate the risk of flooding in the areas surrounding the La Leche and Motupe Rivers, contributing to improving the safety and quality of life of the respective communities. Package A1, which involves the construction of riverbank defenses and the adaptation of hydraulic interferences, is focused on contributing to the proper control and regulation of the river. My involvement in this project was based on the application of the BIM methodology, responsible for the development of three-dimensional models and their coordination. I managed collaboration across the various areas of the project, including production, planning, quality, cost management, and others, thereby ensuring the proper flow of information among the different components of the project. This management approach contributes to the optimization of resources, time, and equipment efficiency, ultimately supporting the effective execution of construction works on-site. The relevance of BIM lies in its ability to improve communication, coordination, and quality control—essential aspects for ensuring the successful execution of hydraulic infrastructure projects, such as the one described. | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Defensas Ribereñas | es_PE |
| dc.subject | Infraestructura Hidráulica | es_PE |
| dc.title | Implementación del plan de ejecución BIM para la coordinación y control en la construcción de defensas ribereñas del subproyecto A1 en la cuenca del rio Motupe y rio La Leche - paquete MO.1 | es_PE |
| dc.type | info:eu-repo/semantics/monograph | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 78110696 | |
| renati.advisor.dni | 16702085 | |
| renati.advisor.orcid | https://orcid.org/0000-0002-2149-7779 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 732016 | es_PE |
| renati.juror | Morales Uchofen, Nicolas Walter | es_PE |
| renati.juror | Cueva Campos, Hamilton Vladimir | es_PE |
| renati.juror | Rodriguez Serquen, William | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [115]