“EVALUACIÓN Y ANÁLISIS DETALLADO EN LA ELABORACIÓN DE LA LIQUIDACIÓN DE OBRA: MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO E INSTALACIÓN DE UBS EN EL DISTRITO DE YAMBRASBAMBA – PROVINCIA BONGARÁ – REGIÓN AMAZONAS”
| dc.contributor.advisor | Capuñay Capuñay, Yrma del Carmen | es_PE |
| dc.contributor.author | Montenegro Cieza, Jorge Omar | es_PE |
| dc.date.accessioned | 2026-07-02T18:32:33Z | |
| dc.date.available | 2026-07-02T18:32:33Z | |
| dc.date.issued | 2026-06-24 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/17244 | |
| dc.description.abstract | El presente trabajo de suficiencia profesional expone mi participación en la elaboración de la liquidación técnica y económica de la obra denominada “Mejoramiento y ampliación del sistema de agua potable, alcantarillado e instalación de UBS en las localidades de Yambrasbamba, Sichoca y Tambillo, distrito de Yambrasbamba, provincia de Bongará, región Amazonas”, con CUI N.° 2377951. El informe describe el contexto general del proyecto, sus principales componentes de agua potable y saneamiento, así como el procedimiento técnico seguido para la revisión de metrados post construcción, el recálculo de valorizaciones, la aplicación de fórmulas polinómicas de reajuste, la verificación de adelantos otorgados y la determinación del saldo final de liquidación conforme al marco de la contratación pública. A partir de mi experiencia como asistente de ingeniería civil, presento los criterios de análisis, el soporte documentario revisado y los controles empleados para consolidar un expediente de liquidación consistente. Se demuestra que la liquidación de obra no constituye solo una formalidad administrativa de cierre, sino una herramienta de control técnico, económico y legal que permite transparentar la inversión ejecutada, sustentar el monto final de obra y reducir observaciones posteriores por parte de la Entidad o del contratista. Finalmente, el trabajo evidencia que una liquidación correctamente estructurada depende de la trazabilidad documental generada durante toda la ejecución contractual, de la consistencia entre metrados, valorizaciones y modificaciones aprobadas, y de una adecuada interpretación de la normativa aplicable. | es_PE |
| dc.description.abstract | his professional proficiency report presents my participation in the preparation of the technical and financial final settlement of the project entitled “Improvement and expansion of the drinking water system, sewerage network and installation of basic sanitation units in the localities of Yambrasbamba, Sichoca and Tambillo, district of Yambrasbamba, province of Bongará, Amazonas region”, identified with Project Code CUI No. 2377951. The report describes the general context of the project, its main drinking water and sanitation components, and the technical procedure followed to review as-built quantities, recalculate progress payments, apply price-adjustment formulas, verify advances granted and determine the final settlement balance in accordance with the legal framework governing public procurement. Based on my experience as a civil engineering assistant, I present the analysis criteria, documentary support and control mechanisms used to consolidate a consistent final settlement file. The study shows that the final settlement is not merely an administrative closing requirement, but rather a technical, financial and legal control tool that provides transparency regarding the executed investment, supports the final cost of the project and helps reduce later observations by either the contracting entity or the contractor. Finally, the report highlights that a properly structured final settlement depends on documentary traceability generated throughout the contract execution, consistency among quantities, progress payments and approved modifications, and an adequate interpretation of the applicable regulations. | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Liquidación de obra | es_PE |
| dc.subject | Adelanto para materiales | es_PE |
| dc.subject | Metrado post construcción | es_PE |
| dc.subject | Post-construction measurement | es_PE |
| dc.title | “EVALUACIÓN Y ANÁLISIS DETALLADO EN LA ELABORACIÓN DE LA LIQUIDACIÓN DE OBRA: MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO E INSTALACIÓN DE UBS EN EL DISTRITO DE YAMBRASBAMBA – PROVINCIA BONGARÁ – REGIÓN AMAZONAS” | es_PE |
| dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 77417797 | |
| renati.advisor.dni | 16736976 | |
| renati.advisor.orcid | https://orcid.org/0000-0003-0586-0328 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 432016 | es_PE |
| renati.juror | Blas Rebaza, Rocío del Pilar | es_PE |
| renati.juror | Davila Vidarte, Domingo Jorge Luis | es_PE |
| renati.juror | Borja Suarez, Manuel Alejandro | es_PE |