Mostrar el registro sencillo del ítem
Evaluación del control físico y financiero de la ejecución de la IOARR de Optimización de las redes de distribución de agua potable de EMAPAB S.A., distrito de Bagua, provincia de Bagua, departamento de Amazonas.
| dc.contributor.advisor | Capuñay Capuñay, Yrma del Carmen | es_PE |
| dc.contributor.author | Delgado Campos, Luis Miguel | es_PE |
| dc.date.accessioned | 2026-09-09T14:46:06Z | |
| dc.date.available | 2026-09-09T14:46:06Z | |
| dc.date.issued | 2026-08-24 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12893/17678 | |
| dc.description.abstract | El presente informe de Suficiencia Profesional contempla las funciones desempeñadas como asistente de ingeniería en la supervisión de la obra “IOARR: Optimización de las redes de distribución de agua potable de EMAPAB S.A., distrito de Bagua, provincia de Bagua, departamento de Amazonas, con código único 2500364”, con el objetivo de mostrar desde los aspectos generales, antecedentes, la población beneficiaria, la secuencia de la ejecución física y financiera, las modificaciones al expediente técnico, al plazo de ejecución y presupuesto, los principales inconvenientes y las soluciones adoptadas durante la ejecución de obra, todo ello acorde a lo establecido en los documentos técnicos, en el contrato de ejecución y la Ley de Contrataciones del Estado y su Reglamento. El proyecto de la IOARR supuso intervenciones puntuales en las redes de distribución de agua potable del distrito de Bagua, con la finalidad de mejorar la continuidad del servicio, reducir las pérdidas de carga generadas por la acumulación de aire o sedimentos en el interior de las tuberías y mejorar la distribución de presiones en los sectores hidráulicos que conforman el sistema de agua potable de la ciudad de Bagua. La ejecución física de la IOARR implicó principalmente la construcción de cámaras de concreto armado para válvulas de control, reductoras de presión, de aire, macro medidores y data loggers, sus respectivos accesorios y sus adaptación de empalmes correspondientes. Implicó además ejecutar de una serie de empalmes en las redes de distribución para mejorar la sectorización del sistema de agua potable. Dada la naturaleza de la obra y las diversas actividades que implicó su ejecución, se optó por presentar el presente informe con la finalidad de obtener el título profesional como Ingeniero Civil a través de la modalidad de Trabajo por Suficiencia Profesional. | es_PE |
| dc.description.abstract | This Professional Competency Report presents the functions performed as an engineering assistant during the supervision of the project “IOARR: Optimización de las redes de distribución de agua potable de EMAPAB S.A., distrito de Bagua, provincia de Bagua, departamento de Amazonas, con código único 2500364”. Its purpose is to describe the general aspects of the project, its background., and the beneficiary population, as well as to detail the sequence of physical and financial execution, modifications made to the technical dossier, adjustments to the execution schedule and budget, and the principal challenges encountered during project implementation, along with the solutions adopted. All activities were carried out in accordance with the provisions established in the technical documentation, the execution contract, and the “Ley de Contrataciones del Estado” and its Regulations. The IOARR project involved targeted interventions in the drinking water distribution networks of the Bagua District, with the objective of improving service continuity, reducing head losses caused by the accumulation of air and sediments within the pipelines, and optimizing pressure distribution across the hydraulic sectors that make up the city’s water supply system. The physical execution of the IOARR project primarily involved the construction of reinforced concrete chambers for control valves, pressure-reducing valves, air valves, bulk meters, and data loggers, along with their associated accessories and the necessary connection adaptations. Additionally, a series of pipeline connections were carried out within the distribution networks to improve the sectorization of the city’s potable water system. Given the nature of the project and the variety of activities involved in its execution, this report has been prepared with the purpose of obtaining the professional title | es_PE |
| dc.format | application/pdf | es_PE |
| dc.language.iso | spa | es_PE |
| dc.publisher | Universidad Nacional Pedro Ruiz Gallo | es_PE |
| dc.rights | info:eu-repo/semantics/openAccess | es_PE |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | es_PE |
| dc.subject | Valorización de obra | es_PE |
| dc.subject | Adicional de obra | es_PE |
| dc.subject | Deductivo de obra | es_PE |
| dc.subject | Deductive work | es_PE |
| dc.title | Evaluación del control físico y financiero de la ejecución de la IOARR de Optimización de las redes de distribución de agua potable de EMAPAB S.A., distrito de Bagua, provincia de Bagua, departamento de Amazonas. | es_PE |
| dc.type | info:eu-repo/semantics/monograph | es_PE |
| thesis.degree.name | Ingeniero Civil | es_PE |
| thesis.degree.grantor | Universidad Nacional Pedro Ruiz Gallo - Facultad de Ingeniería Civil, Sistemas y Arquitectura | es_PE |
| thesis.degree.discipline | Ingeniería Civil | es_PE |
| dc.type.version | info:eu-repo/semantics/submittedVersion | es_PE |
| dc.publisher.country | PE | es_PE |
| dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
| renati.author.dni | 76195276 | |
| renati.advisor.dni | 16736976 | |
| renati.advisor.orcid | https://orcid.org/0000-0003-0586-0328 | es_PE |
| renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
| renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es_PE |
| renati.discipline | 732016 | es_PE |
| renati.juror | Cueva Campos, Hamilton Vladimir | es_PE |
| renati.juror | Salazar Bravo, Wesley Amado | es_PE |
| renati.juror | Cachay Silva, Roberto Carlos | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Ingeniería Civil [138]







